Reader articles →
UK ATLAS · ENCYCLOPEDIC SOURCE

St Bride's Church

Wikipedia contributors · CC BY-SA · EN · 04/10/2026

Читать на русском
On this page

St Bride's Church is a Church of England church in Fleet Street in the City of London. Likely dedicated to Saint Bridget perhaps as early as the 6th century, the building's most recent incarnation was designed by Sir Christopher Wren in 1672, though Wren's original building was largely gutted by fire during the London Blitz in 1940 and then reconstructed in a neo-baroque style in the 1950s.

Due to its location in Fleet Street, it has a long association with journalists and newspapers. The church is a distinctive sight on London's skyline and is clearly visible from a number of locations. Since 2012, St Bride's celebrates usually on the first or second Thursday of November, the "Journalists' Commemorative Service".

With its steeple standing 226 feet (69m) tall, it is the second highest of all Wren's church spires, with only St Paul's Cathedral itself having a higher pinnacle.

Background

Origins

St Bride's may be one of the most ancient churches in London, with worship perhaps dating back to the conversion of the Middle Saxons in the 7th century. It is believed that its name is derived from Bridget of Ireland, the patron saint of Ireland. It may have been founded by Irish monks, missionaries proselytising the English. It is believed that the original church, founded around the 6th century by Irish missionaries, is the only such Celtic Irish founded church in the east of Britain.

The present St Bride's is at least the seventh church to have stood on the site. Traditionally, it was founded by St Bridget in the sixth century. Whether or not she founded it personally, the remnants of the first church appear to have significant similarities to a church of the same date in Kildare, Ireland. The Norman church, built in the 11th century, was of both religious and secular significance; in 1205, King John held a curia regis there. It was replaced by a larger church in the 15th century.

St Bride's association with the newspaper business began in 1500, when Wynkyn de Worde set up a printing press next door. Until 1695, London was the only city in England where printing was permitted by law.

Site archaeology

What follows is based on the archaeological investigation begun in 1952 directed by W. F. Grimes - and the 1992-5 reassessment by Museum of London Archaeology Service (MoLAS) reported by Gustav Milne. The 1952 investigation was groundbreaking in many ways and achieved a great deal, but lacked both human and financial resources in the austerity of the post war era. It was done at a time when church archaeology was in its infancy, when excavation and recording techniques were less refined than those of today, before radiocarbon dating had been developed, and isotopic analysis was unknown. There was little on-site security and finds were often stolen or even vandalised. Many of the finds are now stored in the crypt under less than ideal conditions, or went missing before the 1992 reassessment, and were poorly labelled or documented. Apparently some records and field notes are also missing - including a notebook covering eight months' work.

Roman

The north-west corner of the church was built over an infilled Roman gravel quarry of late first or early second century - common on the periphery of Roman settlements. This was originally thought to be a Roman defensive ditch, and is still often reported as such. There was no evidence of a Roman cemetery at St Bride's. There were fragmentary remains, mainly under the eastern end, of a probably second or third century Roman building with a plain tessellated floor and painted wall plaster. Only a small portion could be excavated and its purpose is unclear. It was abandoned by the late fourth century, demolished, and debris dumped there by the end of the Roman period. Professor Grimes was certain there was "no question of direct continuity between the Saxon church and the Roman building" - a view upheld by later studies.

Saxon

An L-shaped rubble fragment at the west end of the nave, preserved in the crypt display, deserves mention. It is quite unlike the other medieval remains. It is small. It comprises equal parts Roman tile and ragstone rubble, with some flint, in a bed of sandy gravel with apparently no lime. Could be any time in the Saxon period. The problem is its depth, the top is about one metre below the historic ground level, but it is likely to have subsided into the infilled Roman quarry. It is on the same alignment as the rest of the church, but may have been shaped that way from being cut through by grave digging and the foundations for the west tower. Professor Grimes thought this feature was part of a porch for a western door, however the reassessment by MoLAS cast doubt on this. Its date, and function, remains an open question.

The earliest identifiable church was a single cell masonry structure 7.4m wide. Length given as 18m. Date consensus is late Saxon (after 800) - but no later than 1000-1040. This formed the nucleus around which later additions and rebuilding provide the church known today. In fact the current nave is not a lot wider. There may have been an earlier timber structure, but no evidence for one was found.

Some time after this cell was built it was extended eastward with a square chancel 5.6m by 5.6m, ending in an apse with an internal diameter of 4m. In some fill under the apse foundations was found the handle of a Thetford ware jug that could be dated to 1000-1040. This jug was most likely used (and broken) by workers engaged in the chancel extension, and so may precisely date this phase of building. Hence, also, the terminus ante quem for the earlier single cell. This is how the church should have looked by the Norman Conquest.

It is worth noting that St Bride's in this, its final Saxon form, was quite large. Larger than what is known for many other Saxon parish churches in London. Much larger than St Nicholas Acon, St Nicholas Shambles, St Olave Jewry, or St Pancras - and slightly larger than St Alban Wood Street.

Post-conquest

Twelfth century

Archaeologists unexpectedly found the remains of a heavily built, free standing, bell tower halfway along the south wall and measuring some 7m by 7m. Wall thickness at the base was 1.8m (6 feet). There was a gap of 0.45m between the tower and the church. Clearly the builders wanted to avoid structural problems from having such a massive tower in direct contact with the more lightly built Saxon church. Made of rough ragstone rubble - but with expensive, dressed, Caen stone quoins. There is agreement that the tower is twelfth century, although opinions vary as to which part of that century it belongs. This was a very early tower for a parish church in London - only All Hallows Barking and St Mary le Bow are known to have had towers by the twelfth century (though other early towers may yet be discovered). Other parish churches didn't have towers until after about 1370. St Bride's would therefore have been important for the ringing of curfew from this time. The upper parts of this tower were demolished (or collapsed) well before the Great Fire, possibly about 1400. The lowest section was retained as its deep foundations gave access to burial crypts. London was affected by an earthquake in 1382 of 6-7 EMS which damaged St Paul's and Westminster Abbey - and is likely the reason the tower of St Bartholomew the Great was rebuilt in 1405. This tower at St Bride's was replaced by one at the west end, where the current tower now stands, between 1409-19.

In the late twelfth century the apse was demolished and the chancel extended another 6.8 metres, this time square ended - with an error giving a slight skew to the east wall. In contrast to the bell tower which used meticulously tooled Caen stone, this chancel rebuild used the cheaper Reigate stone instead. Over the top of the levelled apse, under the 12th century high altar, was the prestigious burial of a middle aged heavily built man in a large stone lined tomb. Mortar samples show this tomb was built at the same time as the extension. Probably the prime benefactor for this rebuilding. Clearly a person of considerable wealth and status. There was a widespread medieval belief that the nearer the burial was to the high altar, the greater the sanctity.

The different materials used suggests the tower and chancel extension were two separate projects. The bell tower's costly construction shows a sharp contrast in allocated resources rather than any difference in date.

St Bride's is likely to have received some damage in a third 'Great Fire of London'. Said to have happened in the first year of the reign of King Stephen (1135/1136), and to have burnt a large area of western London between St Paul's and St Clement Danes. The chancel extension may have been part of some repair work. Within a few decades of this fire the roof of St Bride's was clad in fire resistant ceramic tiles - 'shouldered peg tiles'. First used in London in the mid 12th century. Londoners who could afford it covered their rooves in 'thick tile'. St Bride's has provided historians with the best collection yet of these early tiles. As to the previous roofing material, no trace of earlier tile or of any slate or lead roof. Possibly wooden shingles, but most likely - thatch. A handful of old English churches have retained a thatched roof such as St Margaret's Church, Hales and St Mary's Church, Thornham Parva.

Thirteenth century

A narrow aisle 3m wide was added to the north side of the nave. This would have meant piercing or partly demolishing the north wall of the original Saxon cell. Narrow church aisles could be built relatively cheaply if the existing nave roof could be merely extended. Likely early thirteenth century. A similar narrow aisle was added to the north side of All Hallows Lombard Street at about this time.

Next a Lady Chapel 4m wide was constructed on the northern side of the chancel for its full length (12.4m). The construction techniques were different from anything else, including subdued chequerwork walls and arched foundations instead of trench built. Accessed from the churchyard by a north door. About the same time a chapel of similar size dedicated to John the Baptist was built on the south side of the chancel. Simpler construction than the Lady Chapel, similar to the earlier chancel extension. Both late thirteenth century. In these chapels access was originally via the churchyard, with no access from within the church itself.

In the next phase a small crypt was excavated beneath the eastern end of the Lady Chapel. This crypt originally had a north door to the churchyard, and a window to the east. The west wall is chalk blocks, the roof is a chalk block vault with Reigate ribs. When new the white chalk would have helped greatly with being able to see in this crypt. The vaulted crypt roof meant raising this part of the chapel floor over a metre creating a raised dias for the altar. Date: although built after the Lady Chapel it may have been completed by the end of the 13th century - else early fourteenth. It's possible this may not originally have been used as a burial crypt, but as an undercroft for storage - even rented out to a local business. All Hallows Honey Lane, All Hallows the Less, St Mary Colechurch, and St Botolph Billingsgate are all known to have had such undercrofts let out to secular tenants. The earliest reference to the Lady Chapel is a record of a burial in 1361 - though whether that was in the crypt, or beneath the floor of the chapel west of the crypt is unclear.

Fifteenth century

This century was a period of almost complete rebuilding — a new bell tower, this time at the west end — new aisles both north and south - a rebuilt nave - and a third chapel, to St Anne, attached to the southeast corner. This is also a time when written records, such as wills and bequests, are more likely to have survived — allowing more accurate date estimates.

As noted above, the twelfth century southern bell tower is likely to have been damaged by an earthquake in 1382. Traces of the foundations for a replacement tower were found at the west end. It appears today's famous seventeenth century tower was built on the foundations of the fifteenth century one. As well, below ground, Wren's masons apparently reused stone from the 15th century tower showing it to have been made using long blocks of ragstone. Based on this unusual use of ragstone, archaeologist Tim Tatton-Brown placed it as late fourteenth to early fifteenth century. Bequests for this tower: 1409/10, for "bells newly bought" - 1415/16 and 1419, to "the fabric of the bell tower".

A chapel to St Anne was also attached to the south-east corner, alongside the chapel of John the Baptist - for the same length but not as wide. Against the south side of this was built a deep chalk lined pit, apparently a well or cistern. The earliest reference of an altar to St Anne is in 1414.

Source and attribution

Adapted from “St Bride's Church” by English Wikipedia contributors. Main paragraphs and sections are retained; tables, reference markers and technical markup are omitted. This is an encyclopedic adaptation, not a personal review. Original revision and contributor history ↗. Text is shared under CC BY-SA 4.0 ↗. Check current visitor access, tickets and transport with the relevant operator.