Plymouth City Airport
Wikipedia contributors · CC BY-SA · EN · 04/10/2026
Читать на русскомPlymouth City Airport was an airport located near Roborough, 4 mi northnortheast of Plymouth city centre. The airport opened on this site in 1925 and was officially opened by the future king Edward VIII, as Prince of Wales, in 1931.
The airport is owned by Plymouth City Council and leased to Plymouth-based company Sutton Harbour Group under its wholly owned subsidiary Plymouth City Airport Limited that has directors who also have interests / directorships in Newquay Airport. The company have submitted several claims for significant maintenance sums for maintaining the site that appear contrary to the actual activities visible on the property.
In 2009, 157,933 passengers passed through the airport, a sharp increase of 34.0% on the 2008 total of 117,823 making Plymouth one of the few UK airports experiencing significant growth during the period. However, following the withdrawal of London flights in early 2011, the airport's owners said passenger totals had fallen to fewer than 100 a day. The London Stock Exchange was notified on 28 April 2011 that the airport would close by the end of the year.
Plymouth City Airport had a CAA Public Use Aerodrome Licence (Number P687) that allowed flights for the public transport of passengers or for flying instruction, and was part of the Strasser Scheme.
The airport closed and ceased all operations on 23 December 2011. Since that time it has been mothballed with the aviation infrastructure and navigation aids retained pending an attempt by the leaseholder to change the use of the site in planning so that it can be disposed of for residential development.
As result of the announced closure a group from the Plymouth business community initiated a campaign to protect the airport site. The group known as Viable delivered a petition to the city council with more than 38,000 signatures objecting to the Airport closure and asking the council to protect the site.
A full Council debate on the petition concluded with a unanimous vote in support of the airport's retention. There were just two abstentions. Accordingly, in 2014 Plymouth City Council decided to safeguard the site for future general aviation use in the forthcoming Plymouth Plan on the basis of evidence provided in the report on which the council had accepted the airport's closure.
Having achieved its campaign objectives, in 2015 Viable wound up its campaign and created FlyPlymouth Ltd with the objective of acquiring and reopening Plymouth airport. FlyPlymouth proposes to operate Plymouth Airport a general and business aviation airport not relying on commercial passenger services, the withdrawal of which led to the airport's closure.
History
Origins
In 1923, a mail flight, flown by Alan Cobham, to Croydon carried passengers from a grass strip at Chelson Meadow, Plymouth. Following the flight, Plymouth City Council looked for a permanent site for an airport. In 1925, the airport was moved to Roborough in north Plymouth. The Prince of Wales, later Edward VIII, officially opened the airport in July 1931.
As well as transporting mail and passengers, the airport was used as a bad weather training base for the Royal Air Force as RAF Roborough as well as other services of the armed forces.
Throughout the majority of the Second World War the airport was known as RAF Roborough and was the primary protection over the city of Plymouth, with RAF Harrowbeer as its back-up.
Location
The airport was located on Plymbridge Lane, PL6 8BW, situated 2 miles north of nearest Dual carriageway the A38 and 4.5 miles north of Plymouth railway station. As late as 2017, some Road signs across the City still had 'Airport' on them, but the majority had been corrected after the airport's closure in 2011.
As the boundary of the city of Plymouth has changed, the named area in which the airport was situated in had changed as well. Originally named at Roborough, the villages of Roborough and Belliver now sit a mile up the A386 from the site. Developments on both sides of the airport in Glenholt and Estover on one side and Southway on the other see the airport site lie in Derriford now, directly opposite from the University of St Mark & St John.
Development through the 2000s
In September 2007 the airport management announced that the second runway might be sold for industrial and residential development. However, this runway could not be used by commercial airlines. This prompted a response from the city assets manager which indicated a review of the demand for and extent of local interest in a Plymouth City Airport. The end of flights to France together with the added security delays associated with internal air travel when compared with moderately fast road and rail links make Plymouth Airport less attractive than before. Efforts to reinvigorate the support of the local business community met with polite well disposed indifference. Diversion to Newquay is not convenient. The travel on time from London–Gatwick to London Victoria adds considerably to total travel time.
However, despite many local residents sharing the view that these developments represented the 'beginning of the end' for the airport, in October 2007 Air Southwest announced new routes to Dublin, Cork, Chambéry, Glasgow and Newcastle upon Tyne. Sutton Harbour Holdings who owned the airport (and Air Southwest) also investigated the possibility of extending the main runway (13/31) to enable larger aircraft to use the airport and thereby further expand the services provided. Extension of the runway was previously not possible due to a factory (since demolished) located close to the threshold of Runway 31.
Further support for the continued use of the airport came in February 2008 when Air Southwest and the Plymouth Chamber of Commerce & Industry announced the results of an air travel survey aimed at over 200 businesses in Plymouth. The results found that:
82% of respondents believe that the air links are important for the economic prosperity of the city
Only 1/3 of local companies believe Plymouth has good road and rail links to the destinations used for business
More than half of the businesses questioned use Air Southwest's London Gatwick service on a regular basis
A multimillion-pound airport redevelopment was given the go ahead. The redevelopment will be paid for by selling off the shorter of the two runways to build 375 houses, offices and a 60-bed care home.
Closure
On 24 August 2009, the shorter of the two runways 06/24 was closed. On 1 February 2011, the Air Southwest service to London Gatwick ceased. The council had searched for a new operator, but no successor airline came forward to take over. Consequently, on 28 April 2011, Sutton Harbour Holdings announced that the airport would close by the end of the year.
Pursuant to the terms of its lease, Sutton Harbour Holdings issued a Notice of Non-Viability to the City Council triggering the airport's closure on 12 months' notice. Plymouth City Council commissioned an Economic Study into Air Services for Plymouth from Berkley Hanover. While the study showed that the passenger services had been withdrawn at that time, it noted that the airport could operate with 19 seater aircraft providing passenger services and that it could be profitable as a general aviation airport serving military, business and private customers. The chief executive of the Plymouth Chamber of Commerce urged that the general aviation option be adopted, and at the time several parties were in talks with Sutton Harbour Holdings about running general aviation operations at Plymouth Airport.
On 28 July 2011, the last commercial passenger flights operated from the airport. After this point, and until the end of Air Southwest operations in September 2011, passengers were transported by coach to Newquay.
In August 2011, the City Council accepted the Notice of Non-Viability leading to the airport's closure in December.
The airport was officially closed by the Sutton Harbour Group on 23 December 2011. The last aircraft to fly in and out of the airport was a Mooney M20E flown by the so-called "Flying Preacher" John Holme. He arrived in extreme conditions with 60 mph winds at one point during the approach, but, as forecast, the wind veered in time to make the landing possible.
In October 2011, a group of local businesses formed a group called VIABLE, that aims to re-open the site.
Sutton Harbour Holdings released a study in February 2014 that it said proved the airport remained economically unviable.
In 2014, Plymouth City Council announced that the airport would be safeguarded for future general aviation use in its forthcoming Plymouth Plan and that residential development would not be permitted.
In March 2015, the Chancellor of the Exchequer at the time, George Osborne, stated that he would look at commissioning an independent study into the viability of reopening the airport. Following the Chancellor's announcement, London's Heathrow Airport also announced that they had set aside £10 million within a regional route development plan that would only go ahead on the condition that Plymouth City Airport reopens.
The airport post-closure
Jodel controversy
On 9 August 2015, a Jodel D.120A light aircraft, registration G-ASXU, was forced to land at Plymouth Airport due to poor weather. The lease-holders, Sutton Harbour Holdings plc, refused to let the aircraft take off from the airport's runway, citing safety concerns, and concrete blocks were placed around the aircraft to prevent it from being moved. The actions of SHH were widely condemned by members of the UK general aviation community, with a "Free the Jodel" campaign being started online. SHH's social media pages were flooded with messages of criticism.
When it was operational, Plymouth City Airport signed up to the Strasser Scheme, which exempts pilots from charges for emergency landings or diversions. Charles Strasser, who initiated the scheme, called the decision "outrageous", and said, "This flies in the face of the spirit of the agreement".
On the morning of 28 August, three weeks after landing, pilot Martin Ferid flew his Jodel out of the former Plymouth Airport site in front of a crowd of onlookers. Ferid claimed before taking off that "a military air base would have treated me better".
SHH PLC said at the time: “We made clear at the time that this was always an issue of safety and therefore the pilot being able to demonstrate that there was acceptable insurance in place."
Department for Transport study, December 2016
In December 2016 the Department for Transport published its report entitled "A study of consultancy reports' conclusions on reopening Plymouth City Airport for commercial passenger services". The study brings together and reviews in detail the findings from nine previous reports commissioned by interested parties on the potential viability of renewed commercial passenger services from the former Plymouth City Airport (PCA).
The study concludes that there is no clear and consistent evidence across the reports reviewed to suggest that sufficient demand exists to operate commercially viable passenger services from a reopened PCA. It says passenger estimates were found to be equivalent to or lower than the levels seen prior to PCA's closure, when the airport frequently failed to make a profit. The study says that PCA is subject to a range of supply constraints, namely a relatively short runway that limits the range of aircraft and airlines able to operate from the airport. This in turn limits the number of possible destinations served, restricting demand. The study says that the reviewed reports show a number of commercial risks which would limit the viability of the airport. Therefore, when reviewing any business case which considers resuming commercial passenger services at PCA, the extent to which the proposal provides sufficient evidence that the effects of these risks can be mitigated should be considered.
Reaction to Department for Transport study
Before the Department for Transport study was published, BBC Spotlight (South West) ran a report on 28 October 2016 saying that the study was expected to conclude that Plymouth City Airport could not operate without substantial public subsidy. A tweet from BBC Radio Cornwall stated: 'New report warns any plans to reopen Plymouth City Airport would require £9m of Govt funding – would you use it?'
A second tweet on the same day from BBC Radio Cornwall stated: 'Campaigners fighting to reopen Plymouth City Airport have admitted £9m of Govt investment would be needed'.
On Sunday 30 October 2016 the BBC's Sunday Politics South West carried a more in-depth story about the findings of the Department for Transport study saying it appeared to suggest Plymouth City Airport is not viable without £9m of public subsidy. The source of the £9m subsidy claim appears to be paragraph 5.20 (pages 71–72) of the DfT report which references a business plan submitted by the campaign group FlyPlymouth to reopen the airport. The report states: FlyPlymouth do not suggest that a reopened PCA under Option 3 will be financially viable in the short term without government subsidy or support, as their business case includes £4 million in government loans (or an alternative) to help cover site 72 acquisition costs, recommissioning costs and initial operational losses. Further to this, the business case assumes that support from the Regional Air Connectivity Fund (RACF), totalling £5 million across the first three loss-making years of commercial passenger operations, will be provided by the Government.
The DfT study was dismissed as a "red herring" by FlyPlymouth when it was published on 16 December 2016. This was because the Report focussed exclusively on the provision of Commercial Passenger Services but ignored the role of General Aviation. Plymouth City Council had safeguarded the airport for General Aviation use, not passenger services.
Source and attribution
Adapted from “Plymouth City Airport” by English Wikipedia contributors. Main paragraphs and sections are retained; tables, reference markers and technical markup are omitted. This is an encyclopedic adaptation, not a personal review. Original revision and contributor history ↗. Text is shared under CC BY-SA 4.0 ↗. Check current visitor access, tickets and transport with the relevant operator.